Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts
Tuesday, 1 November 2011
21/10/2011-filming problems
The plan we had was to film over the half term, with izzy being away on holiday i was going to pick up the camera that izzy was going to collect and film all through half term. Without having the camera (check group blog for details) no filming was able to be done. I was approached by the female actor who originallly agreed to explained how sorry she was and was still wanting to take part, i then spoke to the original male actor who explained he did not have the time to take part in filming. So i spoke to another male who agreed he would like to take part. The reason we decided against me being filmed was that now we are back at school getting hold of the male outside of school would be alot of hassle. Filming is now being done this week.
Tuesday, 18 October 2011
18/10/2011
we had alot of problems with the male and female actors for the music video and neither were free to be filmed although agreeing and making time arrangemnets. We were let down at last minute. In order to get everything done i then agreed i would take the place of the female actress and a male from outside of school also offered to be the male actor.
Subscribe to:
Posts (Atom)